PAKISTAN NASHPA OILFIELD GAS PROCESSING AND LPG RECOVERY PLANT PROJECT

Project Introduction:

We built a natural gas treatment plant to dispose the feed gas from NASHPA and some detailed engineering productivity indicators are as following:

90 MMCF/Day(sales gas and fuel gas)
16800 Barrel/Day of Condensate Oil
1120 Barrel/Day of NGL
373 Ton/Day of LPG
1 Ton/Day of Propane Gas

This project mainly includes the following equipment, system design, procurement, on-site construction and commissioning.

Natural Gas Treatment Plant

plug flow drip catcher and collection system
split system separation system
dehydration(molecular sieve)device
liquid gas recovery device (including mechanical refrigeration device)
condensed liquid stabilization and flash steam compression device
commercial gas compressor set
measurement and completion set of commercial gas
DCS based process control system
ESD/F&G PLC system based integrate security system
mercury protective bed

Off-site Facility

liquefied gas reserve device
condensate liquid reserve device
liquefied gas and condensate loading device
flare system
wellhead facility, SCADA equipped telemetry system and solar energy system
construction and infrastructure
operator training simulator (OTS)

Public Utilities

electronic power generation system
fuel gas system
hot oil system
discharge and sewage system
instrument/public utilities gas system
nitrogen making system
raw water treatment system
wastewater treatment and disposition system

EPC CONTRACT SIGNING

CONSTRUCTION CONTRACT SIGNING

Inspection and testing the core equipment

LPG tank area

LPG recovery unit

Plant effect picture

Heating oil system

Molecular sleve system

External gas compressor