Kazakhstan

Our company has provided a total of over 150 pieces (sets) of equipment including filter separators, cyclone separators, heating surface skids, production separator skids, metering separator skids, natural gas filters etc. to the oilfields of Kazakhstan-CNPC AKTOBE Oil and Gas Co., Ltd. including Zhanarol oilfield, Kenneyak suprasalt oilfield and sub-salt oilfield, North Buzachi oilfield, Ares oilfield, China-Kazakhstan natural gas pipeline construction engineering and China-Kazakhstan Atasuisk-Alataw Pass crude oil pipeline construction engineering respectively. Our company undertook the EP task for 300*104 m3/d natural gas molecular sieve dehydration project of Zhanarol oilfield in 2008. After the system being put into production, the water dew point was controlled lower than -40°C, and it ensured the normal operation of nearly 400 gas injection wells. Our company undertook the EP task for the natural gas processing project of North Buzachi oilfield in 2011.

North Buzachi natural gas processing station project in Kazakhstan

Zhanarol 4# gas lift and gas dehydration project in Kazakhstan

The first international metering separator in Kazakhstan

North Buzachi desander

Metering separator for sub-salt oilfield of Kazakhstan-CNPC AKTOBE Oil and Gas Co., Ltd.

Metering separator for Zhanarol oilfield of Kazakhstan-CNPC AKTOBE Oil and Gas Co., Ltd.

Stages I and II testing separators for natural gas test production project in the south area of Zhanarol oilfield of Kazakhstan-CNPC AKTOBE Oil and Gas Co., Ltd.

Indirect heating furnace for natural gas test production project in the south area of Zhanarol oilfield of Kazakhstan-CNPC AKTOBE Oil and Gas Co., Ltd.

North Buzachi heating separator project under construction (batches I and II) in 2014

Complex Natural Gas Treatment Project in Kozhasai Oilfield in Aktobe Kazakhstan

The purpose of this project is to build natural gas processing facility in the Kozhasai oilfield. The facility will be used for recovering natural gas containing 2% to 3% (percentage of volume) of hydrogen sulfide. The production of natural gas is 300 million cubic meters per year. Natural gas will be processed (separating gas and condensate) and transported to the gas collection center for further recovery so that liquefied petroleum gas, stabilized gas condensate, and Sulphur products can be produced.

The formal contract was signed with GPC on January 24th, 2017. And we will provide processing equipment skids to KAZAKHOIL AKTOBE and GPC, including design, procurement, equipment supply and installation guide on site. The project is currently at the detail designing phase which will be completed in September 2017.